SASB Standards 対照表
Greenhouse gas emissions
SASB code | SASB accounting metric | Links | ||
EM-EP-110a.1 |
Gross global Scope 1 emissions |
|||
Scope 1, percentage of methane |
||||
Scope 1, percentage covered under emissions-limiting regulations |
0% |
|||
EM-EP-110a.2 |
Amount of gross global Scope 1 emissions from flared hydrocarbons |
|||
Amount of gross global Scope 1 emissions from other combustion. |
||||
Amount of gross global Scope 1 emissions from process emissions. |
||||
Amount of gross global Scope 1 emissions from other vented emissions. |
||||
Amount of gross global Scope 1 emissions from fugitive emissions. |
||||
EM-EP-110a.3 |
Discussion of long-term and short-term strategy or plan to manage Scope 1 emissions, emissions reduction targets, and an analysis of performance against those targets |
Air Quality
SASB code | SASB accounting metric | Links | ||
EM-EP-120a.1 |
Air emissions of the following pollutants: NOX (excluding N2O). |
|||
Air emissions of the following pollutants: SOX |
||||
Air emissions of the following pollutants: volatile organic compounds (VOCs). |
||||
Air emissions of the following pollutants: particulate matter (PM10). |
非開示 |
Water Management
SASB code | SASB accounting metric | Links | ||
EM-EP-140a.1 |
Total fresh water withdrawn. |
|||
Percentage of fresh water withdrawn in regions with High or Extremely High Baseline Water Stress. |
0% |
|||
Total fresh water consumed. |
||||
Percentage of fresh water consumed in regions with High or Extremely High Baseline Water Stress. |
0% |
|||
EM-EP-140a.2 |
Volume of produced water and flowback generated |
|||
Percentage (1) discharged |
67% |
|||
Percentage (2) injected |
33% |
|||
Percentage (3) recycled |
0% |
|||
Hydrocarbon content in discharged water |
非開示 |
|||
EM-EP-140a.3 |
Percentage of hydraulically fractured wells for which there is public disclosure of all fracturing fluid chemicals used |
非開示 |
||
EM-EP-140a.4 |
Percentage of hydraulic fracturing sites where ground or surface water quality deteriorated compared to a baseline |
非開示 |
Biodiversity Impacts
SASB code | SASB accounting metric | Links | ||
EM-EP-160a.1 |
Description of environmental management policies and practices for active sites |
|||
EM-EP-160a.2 |
Number of hydrocarbon spills |
|||
Aggregate volume of hydrocarbon spills |
||||
Spills: volume in Arctic |
北極圏では操業を行っていません |
|||
Spills: Volume impacting shorelines with ESI rankings 8-10 |
2024年に該当する漏出はありません |
|||
Spills: Volume recovered |
0.00 bbl |
|||
EM-EP-160a.3 |
Percentage of proved reserves in or near sites with protected conservation status or endangered species habitat |
0% |
||
Percentage of probable reserves in or near sites with protected conservation status or endangered species habitat |
0% |
Security, Human Rights & Rights of Indigenous Peoples
SASB code | SASB accounting metric | Links | ||
EM-EP-210a.1 |
Percentage of proved reserves in or near areas of conflict |
非開示 |
||
Percentage of probable reserves in or near areas of conflict |
非開示 |
|||
EM-EP-210a.2 |
Percentage of proved reserves in or near indigenous land |
非開示 |
||
Percentage of probable reserves in or near indigenous land |
非開示 |
|||
EM-EP-210a.3 |
Discussion of engagement processes and due diligence practices with respect to human rights, indigenous rights, and operation in areas of conflict |
Community Relations
SASB code | SASB accounting metric | Links | ||
EM-EP-210b.1 |
Discussion of process to manage risks and opportunities associated with community rights and interests |
|||
EM-EP-210b.2 |
Number of non-technical delays |
非開示 |
||
Duration of non-technical delays |
非開示 |
Workforce Health & Safety
SASB code | SASB accounting metric | Links | ||
EM-EP-320a.1 |
Total recordable incident rate (TRIR) |
|||
Fatality rate |
||||
Near miss frequency rate (NMFR) |
非開示 |
|||
Average hours of health, safety, and emergency response training for direct employees |
非開示 |
|||
Average hours of health, safety, and emergency response training for contract employees |
非開示 |
|||
EM-EP-320a.2 |
Discussion of management systems used to integrate a culture of safety throughout the exploration and production lifecycle |
Reserves Valuation & Capital Expenditures
SASB code | SASB accounting metric | Links | ||
EM-EP-420a.1 |
Sensitivity of hydrocarbon reserve levels to future price projection scenarios that account for a price on carbon emissions |
|||
EM-EP-420a.2 |
Estimated carbon dioxide emissions embedded in proved hydrocarbon reserves |
非開示 |
||
EM-EP-420a.3 |
Amount invested in renewable energy |
|||
Amount revenue generated by renewable energy sales |
非開示 |
|||
EM-EP-420a.4 |
Discussion of how price and demand for hydrocarbons or climate regulation influence the capital expenditure strategy for exploration, acquisition and development of assets |
非開示 |
Business Ethics & Transparency
SASB code | SASB accounting metric | Links | ||
EM-EP-510a.1 |
Percentage of proved reserves in countries that have the 20 lowest rankings in Transparency International’s Corruption Perception Index |
非開示 |
||
Percentage of probable reserves in countries that have the 20 lowest rankings in Transparency International’s Corruption Perception Index |
非開示 |
|||
EM-EP-510a.2 |
Description of the management system for prevention of corruption and bribery throughout the value chain |
Management of the Legal & Regulatory Environment
SASB code | SASB accounting metric | Links | ||
EM-EP-530a.1 |
Discussion of corporate positions related to government regulations or policy proposals that address environmental and social factors affecting the industry |
Critical Incident Risk Management
SASB code | SASB accounting metric | Links | ||
EM-EP-540a.1 |
Process Safety Event (PSE) rates for Loss of Primary Containment (LOPC) of greater consequence (Tier 1) |
|||
EM-EP-540a.2 |
Description of management systems used to identify and mitigate catastrophic and tail-end risks |
Activity Metrics
SASB code | SASB accounting metric | Links | ||
EM-EP-000.A |
Production of oil |
IR(投資家情報)>IRライブラリー>決算短信・決算説明会資料>2024年12月期>決算説明会資料 なお、タイトオイルの生産は行っていません |
||
Production of natural gas |
IR(投資家情報)>IRライブラリー>決算短信・決算説明会資料>2024年12月期>決算説明会資料 なお、シェールガスの生産は行っていません |
|||
Production of synthetic oil |
非開示 |
|||
Production of synthetic gas |
非開示 |
|||
EM-EP-000.B |
Number of offshore sites |
非開示 |
||
EM-EP-000.C |
Number of terrestrial sites |
非開示 |